Building A House – The Good Life France https://thegoodlifefrance.com Everything you ever wanted to know about france and more Mon, 07 Oct 2024 11:37:13 +0000 en-US hourly 1 https://i0.wp.com/thegoodlifefrance.com/wp-content/uploads/2019/04/cropped-Flag.jpg?fit=32%2C32&ssl=1 Building A House – The Good Life France https://thegoodlifefrance.com 32 32 69664077 How to plan a new build in France https://thegoodlifefrance.com/how-to-plan-a-new-build-in-france/ Mon, 07 Oct 2024 11:37:13 +0000 https://thegoodlifefrance.com/?p=277342 A guide to how to plan a new build in France and how to ensure your new build dream runs smoothly. You’ve identified the perfect plot of land. The finance is in place and now all you’ve got to do is turn your vision into reality. It is such an exciting time as you start […]

The post How to plan a new build in France appeared first on The Good Life France.

]]>
How to plan a new build in France

A guide to how to plan a new build in France and how to ensure your new build dream runs smoothly.

You’ve identified the perfect plot of land. The finance is in place and now all you’ve got to do is turn your vision into reality. It is such an exciting time as you start to plan a new build unique home in France, and any new build project should be interesting, fun and immensely rewarding.

That said, every new build comes with its own set of challenges, and it needs to be well planned and executed from the get-go. French Plans English speaking architects in France are just the people to help. Whether you want to build a cosy private house or a whole gite complex, they can help make sure that your project runs smoothly, your vision is realised, and your nerves aren’t frayed with the headache of unexpected obstacles, never ending planning applications and things going wrong.

We asked them for their top tips and helpful advice for planning a new build in France:

What are your plans?

You may still be searching for your dream plot, or you may be about to sign on the dotted line but before you go any further, stop and ask yourself these all-important questions:

  • Do you have a clear idea of what you want your French new build to look like? For example, do you want modern and chic, eco and sustainable, traditional and in keeping with other buildings, a small build, or an entire complex? Do you have any plans or drawings yet?
  • Depending on what sort of build you are planning, there will be several different questions you need to ask before you buy, from knowing whether there are existing service connections for electricity and water to planning regulations in play. And there may be several types of permission required.

Designing your new build

You really need to have a detailed knowledge of the site and the build plan if you want your project to run smoothly and be a success. If you haven’t got a clear idea yet about the type of build you want, French Plans can work with you to come up with a bespoke design. They can also explore different design styles which can be as diverse, as eco-friendly or modular houses to more traditional style builds.

Hand in hand with design comes the feasibility of your site. You will need to assess the suitability of an area and what planning permissions you will need and are likely to get. For example, there may be certain local design considerations in a particular area that mean you will never get planning permission for a modern looking property. But equally, an area 30 miles down the road may be much more likely to grant permission.

All these considerations can and do have an impact on the time frame of your project, your budget and ultimately the success and smooth running of the build. French Plans are registered in France, and have 20+ years of experience of achieving planning permission for new builds in France and can help save you a lot of stress by ensuring that your location is a perfect match for your plans.

Getting permission

All new build projects in France will need planning permission, even if the land has previously been used for residential purposes. If you are buying a plot with planning permission included, and the designs that have approval are exactly what you want then great, but if you want to make any changes you will still need to submit a planning application of some kind.

If you’ve ever had to apply for planning permission, whether in France or elsewhere in the world, you’ll know it can be complicated. And slow. And how is your French? Because planning applications can be quite technical, and it’s essential that you understand the nuances of the language.

DIY planning

Planning applications for any property over 150 m2 (either footprint or habitable space whichever is the greater) must be prepared and submitted by a French-registered architect, such as those at French plans.

You can do the planning applications yourself if the property is going to be smaller than 150 m² (unless it’s for commercial properties), but the planning authorities are very strict and if you get any of the paperwork wrong, your application is likely to fail. Even if you already have a clear idea of the design you want and some basic plans, you may well need help transforming your blueprint into a format that is acceptable to the planning authorities.

There are various other aspects of your planning application that you need to consider such as whether you need to apply for change of use, whether there are any area specific planning issues and whether you can protect yourself by ensuring your purchase is conditional on planning permission being granted or being likely to be granted.

French Plans have the expertise and experience to handle this for you. They have a full understanding and experience of planning law and the requirements, and they speak French and English so they can explain all the details to you in straightforward language. They can prepare and submit all the documentation in the required format, liaise with the authorities on your behalf, and will always advise you about your prospects of success. That means you can focus on the fun parts of the planning and build.

Knowing what you’ve got and what you need

There are certain things that every new build needs namely water, electricity and sewers. Your plot may have these already but if it hasn’t, you’ve got some research to do. There are all sorts of question to consider including whether you can get access to mains drains or will need your own septic tank, and how easy (or expensive) it is going to be to get these vital services installed. And all new build properties must be built in line with specific thermal regulations. These are all elements the team at French plans can help you navigate.

Getting there

Finally, don’t forget, you’re going to need access to your site. This may seem straightforward but isn’t always. There can be issues around this if you’re accessing your plot over someone else’s land, need to add access or are hoping to let your property and therefore require access for holiday guests, etc.

Working together

The team at French Plans are fully qualified English-speaking architects and planning consultants. They offer end to end design and planning services for any size of project, anywhere in France. Says architect Tom Easdown:

“At French Plans, we are here to ensure that your planning application runs as smoothly as possible. Whether it be for pre-purchase advice about the plot you have chosen; working with you to design your dream home; or helping you to get planning permission for designs you already have in mind. We understand the complexities of working with international clients to successfully navigate the French planning system together. Get in touch to discuss how we can help you get permission to build your dream French home.”

Find out more and contact the team for all your planning permission and design needs in France at www.frenchplans.com

The post How to plan a new build in France appeared first on The Good Life France.

]]>
277342
My Good Life in France in pursuit of the rural dream house! https://thegoodlifefrance.com/my-good-life-in-france-in-pursuit-of-the-rural-dream-house/ Tue, 06 Feb 2018 09:43:37 +0000 https://thegoodlifefrance.com/?p=67091 When I first set eyes on the run down, neglected and frankly horrible house I now call home, I never ever imagined that so many years later, I would still be working on it! It was a chilly day in February, sleet fell making everything look rather drab and bedraggled, a bit like how I […]

The post My Good Life in France in pursuit of the rural dream house! appeared first on The Good Life France.

]]>

When I first set eyes on the run down, neglected and frankly horrible house I now call home, I never ever imagined that so many years later, I would still be working on it!

It was a chilly day in February, sleet fell making everything look rather drab and bedraggled, a bit like how I felt as I traipsed round a small town in France looking for a hot meal when everything seemed to be closed against the weather.

I’d ended up looking at a few houses just for something to do before going back to London after a day trip to buy wine in Calais. And in a bizarre twist of fate, I’d fallen head over heels for one of them and bought it! It was very cheap, needed heaps of work “a money pit” my dad said. But, there was something about it that pulled at my heart strings: a room with flint stone walls, wooden beams with the carpenters mark carved into them, plus an acre of land at the back.

20 years later it’s pulled at my purse strings too I can tell you. But, it looks nothing like it did. It’s been worth the hard slog. And its been a rollercoaster ride of an adventure, one that I wrote about in my book My Good Life in France: In pursuit of the Rural Dream. So many people  who read the book said that they’d like to see photos. So for you, here are some before and after photos of my little French farmhouse.

The house the house as it is now, not quite finished (top photo), we’re working on shutters and making it look pretty! This is the house as it was, the day I bought it:

The sitting room before. It was a dingy room, the orange wood panelled walls sucked any light out of the room, it was freezing cold and not at all pleasant:

and the sitting room after, full of my bits and pieces, I’m definitely not a minimalist style person:

The Kitchen the day I first saw it. That’s my dad announcing that the walls were damp, the wood had wood worm, dry rot and damp rot! “This house is not fit to live in” he said.

and after, as you can see, we added a small extension where the window was:

 

The dining room before (and yes I’m wondering what I saw in this place too). I remember when we entered the house and came into this room, my feet squelched on the floor because it was damp. The walls were a horrible mix of concrete block and chalk blocks but I thought the beams were lovely!

and after, it’s now the first room you enter when you come into the house. This is where neighbours come in for a cup of coffee or a glass of wine. On cold days we light the wood fire and chill!

We did all the building work ourselves. We did courses and YouTube tutorials and much was by trial and error. We salvaged wood and made cupboards from scratch. We toiled on the house day and often night. Someone asked me if I’d do it again. I’d have to think about it a bit. It’s been mostly fun and awful at times. Things have gone wrong, still do go wrong. We’ve had burst pipes and broken fingers, we’ve argued over the decor, we’ve worked in the freezing cold when our fingers turned blue but we had to get things done. We’ve laughed a lot, we’ve learned a lot and we’re still learning (and laughing). And yes, I’d do it all again at the drop of a hat!

Janine Marsh is the author of  several internationally best-selling books about France. Her latest book How to be French – a celebration of the French lifestyle and art de vivre, is out now – a look at the French way of life. Find all books on her website janinemarsh.com

Want more France?

Discover more fabulous destinations in France with our free magazine The Good Life France

Love France? Have a listen to our podcast – everything you want to know about France and more!

All rights reserved. This article may not be published, broadcast, rewritten (including translated) or redistributed without written permission.

The post My Good Life in France in pursuit of the rural dream house! appeared first on The Good Life France.

]]>
67091
Renovating in France Planning Permission Requirements https://thegoodlifefrance.com/renovating-in-france-planning-permission-requirements/ Sun, 13 Nov 2016 14:44:03 +0000 https://thegoodlifefrance.com/?p=58709 Whether or not you need planning permission for your renovation in France depends on what you are going to do. Applying for Planning permits in France A good starting place is the local town hall, and, even if you think you don’t need permission, it’s usually best to check, rules change. The Mayor or his […]

The post Renovating in France Planning Permission Requirements appeared first on The Good Life France.

]]>
planning-permission-france

Whether or not you need planning permission for your renovation in France depends on what you are going to do.

Applying for Planning permits in France

A good starting place is the local town hall, and, even if you think you don’t need permission, it’s usually best to check, rules change. The Mayor or his staff should be able to tell you whether or not you have to get permits signed off or if you can simply declare the works for your renovation project. They can also provide the necessary forms and make you aware of local restrictions or regulations. And, they’ll tell you where you need to go if there are further permits required such as the DDE, the Departmental Directorates for Equipment who control some aspects of permission granting.

If you’re buying a house and you know that you will need to request planning permission then before completing the sale process check with the notaire to ensure there are no planning restrictions in the area. If you know you are going to require planning permission, after you have paid the deposit but before you pay the full amount, you can ask the notaire conducting your purchase to apply for planning permission and insert a clause in the purchase contract that if permission is not granted, you can withdraw without financial penalty (including retrieval of your deposit).

Planning permits for updating the interior

Interior work on an existing house doesn’t require a permit – unless a change of purpose is involved e.g. converting a loft or outbuilding, creating a bathroom etc. The reason for this is that the conversion of space may mean that you need to pay more tax as you have more facilities in the house, eg a bathroom.

If the habitable space being created exceeds 170m², you need to employ an architect; this includes extending the current liveable area, e.g. if you have 150m² and converting an outbuilding adds 21m² or more. The architect will draw up the plans, liaise with the planning department and make life easier for you when it comes to form filling.

Planning Permits for Updating the Exterior

When it comes to exterior work, you need permission if you intend to change the appearance, including colour, such as painting shutters, doors, windows, walls, or if you intend using a different material e.g. render. Repairs don’t need a permit but amending the appearance whilst conducting repairs does, for example repairing a roof/adding a roof.

What’s the fosse all about? If your property comes with a fosse septique (septic tank) arrangement for waste water etc, make sure you know where it is. New regulations state that if you don’t know the location, you’ll have to put in a new one and that’s a big expense. If the seller can’t confirm location, this may be a chance for price negotiations. Estate agents are aware of this requirement but many brush buyers’ fears away – don’t be fooled.

Septic tanks: Permission is required to install a new one and you will probably need a survey conducted plus completion sign off.

Helpful words and phrases

Permis de démolir – Demolitions permit
Certificat d’urbanisme (CU) – Outline planning/planning in principle
Déclaration préalable – Minor works, this planning form supersedes the Déclaration de travaux
Permis de construire (PC) – Planning application for a building permit, an architect must be employed to submit this form.
Déclaration d’ouverture de chantier – Commence work on site
SHOB (surface hors œuvre brut) – gross floor area

The post Renovating in France Planning Permission Requirements appeared first on The Good Life France.

]]>
58709
Old French house renovation | The Gym https://thegoodlifefrance.com/old-french-house-renovation-the-gym/ Tue, 03 Dec 2013 13:00:09 +0000 https://thegoodlifefrance.com/?p=31637 I bought a wreck of a farm house in France. Dirt floors, corrugated iron doors, holes in the roof, rising damp, descending damp… you name it, this house had a lot of issues. I wasn’t daunted, I knew it had potential. I had dreamed about doing an old French house renovation for years. After a […]

The post Old French house renovation | The Gym appeared first on The Good Life France.

]]>
old french house renovation
My Dad doubting the outcome!

I bought a wreck of a farm house in France. Dirt floors, corrugated iron doors, holes in the roof, rising damp, descending damp… you name it, this house had a lot of issues.

I wasn’t daunted, I knew it had potential. I had dreamed about doing an old French house renovation for years.

After a rather sticky time sorting out planning permission, it was finally time to start renovating the end room. I’d spent a whole year of going back and forth to the Town Hall and the DDE (Departmental Direction of Equipment who grant planning in my area) on my few days a month in France (I was working in London) only to receive rejection after I’d done everything they’d asked. The mayor’s assistant whispered to me that I should get an architect to apply on my behalf – I did and it turned out that roughly half of my house wasn’t even registered on the official documents which had caused the confusion. Drawings were resubmitted and 5 days later – permission was granted!

old french house renovation
The Gym to be as it was

One of the things we requested planning for was to rebuild a room at one end of the house. There was an end wall, joined to the main house by a dilapidated plastic roof – open at both ends with ivy growing over and in it. Although it showed on the plans as a habitable space – the only inhabitants willing to rough it were the local wild cats and some brave birds.

We somehow got it into our heads that we’d like a gym. Quite why I don’t know. With 21 rooms to completely rebuild and decorate, lots of structural work including new builds, new roofs, an acre of land to tame – we didn’t really need any more exercise. But, we figured, the French house is miles from civilisation, we’re never going to be able to get to a gym let alone afford to join one when we finally finish renovating so that’s what we went with. The gym was to be opposite the posh spa we had planned for the pig shed!

We started by digging out the dirt floor to level it and then mixed several tons of concrete to form a new solid floor. In all these jobs, the OH (other half) is the guv’nor and I am the gofer (I go fer this and go fer that). That means that I have to fetch and carry the tools, level the concrete off, hold things in place without moving even if a spider is crawling towards me – I often fail this part of the job. One of the other jobs I have to do is fetch and stack the breeze blocks that are commonly used to build walls here in this part of France. They’re heavy.

old french house renovation
A floor – at last!

The first day of building the end walls I almost dropped one of the breeze blocks, caught it in mid-air and managed to break a finger. Some women would wail about breaking a finger nail so I think I was justified in having a bit of a sniffle but I was told to bind a lolly stick to my floppy finger and get on with it.

We built the two end walls, installed doors and windows, put on a new roof, insulated, boarded, plastered, painted, laid a new wooden floor and hung mirrors and pictures. Gym equipment was bought out of storage, dusted off and set up and it looked like the most perfect gym.

old french house renovation

After all that work you’d think I’d be as fit as a flea wouldn’t you. No such thing, my first real work out in the gym, I stuck on “Eye of the Tiger” (the Rocky theme Music), took a deep breath, bent down to pick up and dumb bell and pulled a muscle in my back – I couldn’t use the gym for months!

A bientôt
Janine

The post Old French house renovation | The Gym appeared first on The Good Life France.

]]>
31637
Renovation in France: Hall of the old French farmhouse https://thegoodlifefrance.com/renovation-in-france-hall-of-the-old-french-farmhouse/ https://thegoodlifefrance.com/renovation-in-france-hall-of-the-old-french-farmhouse/#respond Fri, 30 Aug 2013 07:16:56 +0000 https://thegoodlifefrance.com/?p=24408 When I bought the old French farmhouse it wasn’t the hall that sold it to me that’s for sure! A horrible dark, damp and smelly room consisting of breeze block and chalk block walls and a rather unattractive tiled floor which had been covered with ugly carpet. There was a 40cm high step into the […]

The post Renovation in France: Hall of the old French farmhouse appeared first on The Good Life France.

]]>
renovation in france
The hall the day I viewed it with door to kitchen
renovation in france
Hall and door to kitchen finished

When I bought the old French farmhouse it wasn’t the hall that sold it to me that’s for sure!

A horrible dark, damp and smelly room consisting of breeze block and chalk block walls and a rather unattractive tiled floor which had been covered with ugly carpet.

There was a 40cm high step into the kitchen and the door way was very low – you had to climb up to the step and then crouch down to get under the door frame. As I am very short the climb was hard but I never hit my head. The OH is very tall so he simply high stepped it – and promptly hit his head every time.

A boxed off entry to the front door made from bits of old wood was hung with enormous and thick spiders webs interspersed with peeling, random pieces of ancient wall paper.

renovation in france
The utility room – according to the estate agent particulars

There was a small, bricked up room to one side which was termed a “utility room” on the estate agents particulars. No ordinary utility room this, it came complete with an open pipe to the outside which let the cold air in along with all manner of hideous insects and small creatures. The OH hung an old basket hung over the end to try to stop the critters getting by but they just knocked it off with a Gallic shrug no doubt and let themselves in.

A tiny windy staircase built for Hobbits led to the next level and was completely unsafe. The steps were uneven, very narrow and steep and led up to a wooden landing – everyone who attempted to climb them found them unpleasant and dangerous – the OH fell up them once and hit his head at the top on a beam. He had a neat cut right across the top of his head – for ages afterwards he looked like a human money box.

The saving grace in the hall was the huge beam which ran the width of the room with smaller beams coming off of it. It was so bowed it looked like an enormous boomerang but the beams are very old and were really the only thing that were worth retaining in the whole sorry mess.

When it was time to renovate this area, we had no choice but to gut the whole room

We took down the wall that separated the hall from the living room – it was in the wrong place, it was badly constructed, the doors were in the wrong place – it was easier to just take it out and start again.

renovation in france
Hall door in wrong place

The front door was in the wrong place – the path to the front gate was to the left of it so that had to come out and where the door had been became a window and we bricked up the bottom half. The doorway was moved to the centre of the hall where previously a window had stood. I cannot tell you how much fun it wasn’t to have ten tons of dust cover everything from cutting out a new doorway.

We replaced the windows and doors with new ones – this was a big bone of contention. I wanted to keep the old ones and restore them but the OH (who is a builder and Guv’nor when it comes to this stuff) said we had to have new if we were to keep the drafts out. This was enough to win me over – the house was very cold in the winter as there were so many holes in the roof and the walls and round the old single glazed windows, and I knew he was right even if it wasn’t aesthetically as pleasing.

renovation in france
One door out and another door in

Our first winter in this house left me in tears and wanting to go back to London. We would sit and read with two oil fires and a wood fire in the room, covered in blankets, and still have frosty breath – you know when you breathe out and the air is so cold you make patterns! The bed sheets would be damp every night despite the dehumidifier going 24 hours a day; condensation ran down the walls and mould formed on almost everything – we felt permanently cold. I knew that making the house damp and draft proof and warm was a priority.

Our first job in the hall was to build a new fireplace – we decided to locate it in the centre of two rooms – between the hall and the front room – a double sided wood burner which would heat the whole of the downstairs. It took several weeks to do as it involved building a brick fireplace and hearth – in which we set my two little stone lions from Lassco, the salvage yard in London. I’d had them stored for years waiting for somewhere for them to go and they looked perfect either side of the brick hearth in what would be the front room! Then we installed the huge wood burning fire and a stainless steel, double skin chimney up through the centre of the house – we used that style because its safer, cleaner and fumes are trapped inside.

renovation in france
The hall fire after the whole room was completed

When it was eventually finished, we lit that first fire and it felt like all my Christmases had come at once.

But it was still only the start of our renovation odyssey, the next job was to make a stair case – with salvaged wood that Winston Churchill once walked on!

A bientôt
Janine

The post Renovation in France: Hall of the old French farmhouse appeared first on The Good Life France.

]]>
https://thegoodlifefrance.com/renovation-in-france-hall-of-the-old-french-farmhouse/feed/ 0 24408
The Pig Shed becomes a posh spa https://thegoodlifefrance.com/the-pig-shed-becomes-a-posh-spa/ https://thegoodlifefrance.com/the-pig-shed-becomes-a-posh-spa/#respond Wed, 22 May 2013 08:22:56 +0000 https://thegoodlifefrance.com/?p=22340 After the external structural work was begun (roof tiles rain down) and the rebuilding was finished (a phoenix arises from the rubble) – it was time to work inside the pig pen. The OH who is the Gov’nor when it comes to building, instructed me, the apprentice, to do the painting of the horrible black, […]

The post The Pig Shed becomes a posh spa appeared first on The Good Life France.

]]>
renovating in france

After the external structural work was begun (roof tiles rain down) and the rebuilding was finished (a phoenix arises from the rubble) – it was time to work inside the pig pen.

The OH who is the Gov’nor when it comes to building, instructed me, the apprentice, to do the painting of the horrible black, sticky, smelly anti-damp paint on the breeze block walls before we went any further.

By now I was used to pulling the pallet truck with the hot tub on it which was in the middle of the room. As you may recall we had to put it in the room before we built the last wall as it was way too big to fit in through a door or window.

Painting with anti-damp liquid is a horrible job, it smells vile, clogs up the paint brush and is physically difficult to get off the brush and onto the surface.

After that we got on with stud walls, insulating – and I can’t stress how much we’ve learned how important it is to insulate as much as possible when you’re renovating these old French properties. We boarded the walls and ceiling and then plastered. By now we had split the room into two halves – one for the hot tub, the other for a sparring area for the OH who is a boxer and for another great e-bay bargain I’d found – a sauna!

The end of the first room to be renovated was in sight – it had taken months. The last bit of plastering done we heaved a sigh of relief and tried to pull the hot tub into place – the OH fell backwards and straight into the wall where he promptly made an enormous derrière sized hole.

I can’t tell you we laughed it off – we didn’t.

After we had replastered, our neighbours Aris who is Greek and Katherine who is Australian helped us to manoeuvre the hot tub and this time it went to plan.

We painted, laid the floor and unwrapped the hot tub.

renovating in france

What a moment it was – we were so thrilled. After all the hard work we finally were able to have a bit of luxury we thought…

We’d bought the hot tub to France from the UK on the back of our old trailer, it had been stored for 3 years in a shed and then the best part of a year in the pig pen while we were renovating around it – we had no idea if it would even work, the lights came on when we plugged it in but we could only really know once it was filled with water.

We ran a hose pipe into the tub and after several hours it was full. We turned it on – soft coloured lights came on under water, bubbles came out  of holes – we were ecstatic.

However bubbles weren’t the only thing that came out – water did too, from underneath the hot tub. Not only that – the water didn’t heat up at all.

The chances of getting a hot tub engineer to this remote part of France for a reasonable price was not an option. We had to figure it out for ourselves – the company I’d bought the hot tub from had gone out of business (that’s why I’d got it so cheap in the first place – definitely a lesson for me there).

renovating in franceWhen you take on a big renovation project in France you learn to be pragmatic and determined. We scoured the internet and figured out we had a broken pipe and a broken pump. We managed to track down replacements from other models that looked similar – it took several months.

Finally, we had the bits, the OH went out to the pig pen/spa and told me to stay away until he’d finished.

Several hours later, he returned to the house triumphant, took me by the hand and led me to the prize – a bubbling, warm watered tub, in a dry floored, sparkling clean room.

I can tell you I stayed in that tub until my skin was so wrinkled I looked like an alien!

A bientôt

Janine

The post The Pig Shed becomes a posh spa appeared first on The Good Life France.

]]>
https://thegoodlifefrance.com/the-pig-shed-becomes-a-posh-spa/feed/ 0 22340
Property Eco Loans in France https://thegoodlifefrance.com/property-eco-loans-in-france/ Tue, 21 May 2013 08:20:50 +0000 https://thegoodlifefrance.com/?p=22304 The éco-prêt à taux zéro is an interest-free loan of up to €30,000 to improve the energy efficiency of your property. The French Government has pledged to reduce energy consumption and greenhouse emissions and the eco loan concept supports this. Eco loans are available from high street banks and are completely interest free to residents […]

The post Property Eco Loans in France appeared first on The Good Life France.

]]>
eco loans FranceThe éco-prêt à taux zéro is an interest-free loan of up to €30,000 to improve the energy efficiency of your property. The French Government has pledged to reduce energy consumption and greenhouse emissions and the eco loan concept supports this.

Eco loans are available from high street banks and are completely interest free to residents in France whose application complies with the requirements.

The duration of the Eco Loan is usually ten years but can be extended to 15 years if necessary – i.e. there is a lot of building work and therefore the top amount is borrowed. The amount you can borrow depends on the work to be undertaken and applies only to properties built before 1 January 1990.

Interest-free Eco Loans in France cover energy saving installations and renovations such as loft insulation, fitting double glazed windows and doors, solar panels, green heating systems, rain water harvest systems, sewage systems,

In order to gain an Eco Loan you will need to have a thermal survey conducted on your property and apply to your local energy efficiency office: Agence de l’Environnement et de la Maîtrise de l’Energie (ADEME). You can download a form (in French) from their website (below).

You must apply for a package of works (a bouquet de travaux), not a single element – the loan is not available for just one unit of renovation/conservation.

Once the form is completed you will need to apply to your bank for the loan. This will require you to arrange estimates (devis in French) for the building work from a registered builder – DIY projects are not in scope.

Once the loan is granted, the lender has a period of 2 years to complete the work and return to the bank to present the invoices and receipts.

Useful websites:

Agence de l’Environnement et de la Maîtrise de l’Energie

French Government Website gives clear guidelines and assistance

The post Property Eco Loans in France appeared first on The Good Life France.

]]>
22304
Renovating in France | A phoenix emerges from the rubble https://thegoodlifefrance.com/renovating-in-france-a-phoenix-emerges-from-the-rubble/ https://thegoodlifefrance.com/renovating-in-france-a-phoenix-emerges-from-the-rubble/#respond Mon, 20 May 2013 10:07:38 +0000 https://thegoodlifefrance.com/?p=22337 Having removed the roof from the old pig shed (and survived being knocked out by a roof  tile dropped on my head) – we now had an empty three walled shell. It was time to move the hot tub in! Yep – the pig shed was earmarked for an Italian hot tub bargain that I had […]

The post Renovating in France | A phoenix emerges from the rubble appeared first on The Good Life France.

]]>
renovate in France

Having removed the roof from the old pig shed (and survived being knocked out by a roof  tile dropped on my head) – we now had an empty three walled shell.

It was time to move the hot tub in!

Yep – the pig shed was earmarked for an Italian hot tub bargain that I had got from a company that was selling off stock. It had been covered in bubble wrap and a giant tarpaulin for three years in the shed and weighed an absolute ton.

We managed to get it onto a hand pallet truck (don’t ask, we have so much stuff in our house) and wheel it down the garden into the building. It had to go in at this stage as once the last wall was up there would be no way to get it in through the door or windows. I honestly don’t know how we managed between the two of us but we did – we pulled and pushed that trolley with the hot tub balanced precariously down a 100 metre grass hill that was the front garden and into the building.

renovate in france

After that we built a new wall with holes for a door and windows, repaired the existing walls, laid a concrete floor and rebuilt the roof. We had to keep moving the hot tub from one place to another and work round it – it wasn’t easy.

The OH is a builder and carpenter and knows what he is doing. I on the other hand know nothing of building and renovation and what I am taught I seem to forget instantly – causing the OH to shout at me, the lowly apprentice. I dread to think what the French neighbours must think of all our yelling at times. This usually occurs when I am told to get a tool and get the wrong tool – this happens a lot. I am called names and sent back until I get it right. Being an apprentice labourer is not all fun.

renovate in france

Putting the roof back on involved the OH making the gable ends down on the ground and then us having to haul them up to the top of the walls – they were big and very heavy.

One of my (many) phobias is heights.

After a bit of coaxing, followed by an instruction to “bloody well man up”, I mounted the ladder to the top of the wall where I was to pull the heavy wooden gable ends up while the OH lifted them.

How we don’t both have hernias is something I will never understand.

We finally, after much heavy breathing, grunting (not in a good way) and swearing, got the first gable resting on the top of the wall. My job was to stand and hold it while the OH bolted it down. I felt sick and dizzy standing up there holding this huge wooden frame that weighed more than me and was taller than me. Pierre the farmer went by on his tractor and laughed out loud at the latest antics of the mad English pair.

By the end of the day we had the gable ends up and secure. By the end of the week we had the roof tiled.

It was time to do the internal work – electrics, stud wall, insulate, stud ceiling, plaster board, plaster, paint, lay wood floor. All the time the hot tub had to be moved about, still on the palate truck, in its bubble wrap. We had no idea if it would even work after three years being in storage. We’d unwapped it and tested that it turned on – the lights came on, but it couldn’t be fully tested without being filled with water – we just had to hope for the best but I’m sure you know what happened next…

The pig pen reborn.

A bientôt, Janine

The post Renovating in France | A phoenix emerges from the rubble appeared first on The Good Life France.

]]>
https://thegoodlifefrance.com/renovating-in-france-a-phoenix-emerges-from-the-rubble/feed/ 0 22337
Renovating in France | Roof tiles rain down from the sky https://thegoodlifefrance.com/renovating-in-france-roof-tiles-rain-down-from-the-sky/ https://thegoodlifefrance.com/renovating-in-france-roof-tiles-rain-down-from-the-sky/#respond Fri, 17 May 2013 07:46:06 +0000 https://thegoodlifefrance.com/?p=22336 We (that is me and the Other Half) decided that we would get the structural work done on this old French house before we did any of the internal works and that included some of the out buildings. We started by renovating the barns which came with the house – one of which is in […]

The post Renovating in France | Roof tiles rain down from the sky appeared first on The Good Life France.

]]>
renovating in france

We (that is me and the Other Half) decided that we would get the structural work done on this old French house before we did any of the internal works and that included some of the out buildings.

We started by renovating the barns which came with the house – one of which is in the courtyard to the front of the house – mostly because we were worried that it would fall down – into the road on the other side. We think it was once a pig shed.

The building had walls to three sides, a tiled roof and was held up with various bits of wood. It was filled with coal, ashes from decades of wood fires that had just been chucked on the floor – a dirt floor on different levels. There was also a huge amount of general rubbish that previous owners couldn’t be bothered to put out for the dustbin collection (all of 5 metres away).The building itself was about 3 metres wide and 10 metres long – a very unaccommodating shape for most uses but we knew exactly what we wanted to do with it!

We had our work cut out for us, first we had to strip the building back to basics which meant taking the roof off completely.

The roof tiles are really old – they’re much bigger than modern tiles and we didn’t want to change the appearance of the house too much so we decided to take them down really carefully for me to clean and then we would reuse them.

This meant the OH standing up on the roof and dropping the tiles down to me to catch and stack.

renovating in france

This went well for a while, we got a rhythm going – I’d put my arms up, the OH would drop a hefty tile down, I’d clutch at it and put it on the steadily growing pile.

Until, I looked up to catch a tile and saw an enormous spider swinging from it.

I don’t like spiders – at all. I inherited a phobia from my Dad. He was once taking part in a very serious Bridge competition with international Masters. They were put up in a hotel. He saw a spider in his room and ran naked (he was in bed) into the hall calling for security. So, my spider fear I hope you agree is understandable if ridiculous.

My immediate reaction was to cover my eyes – not sure why really – so I couldn’t see the spider I suppose.

The OH wasn’t looking – on account of us having a rhythm.

I stood there and the tile dropped right onto the centre of my uncovered head.

I dropped to the floor like a stone I am told.

When I came to the OH had a very concerned look on his face but when we established that I just had a big bruise, a bit of a cut and was fine he found the whole thing hilarious – he doesn’t put up with my phobias and told me to man up.

What do you call a woman with a tile on her head: Roof (Ruth for my non English speaking friends who may not get the joke!)

I was ordered to get back to work and tile dropping began again – this time with me wearing my hard hat.

Next – a phoenix emerges from the rubble…

A bientôt,

Janine

The post Renovating in France | Roof tiles rain down from the sky appeared first on The Good Life France.

]]>
https://thegoodlifefrance.com/renovating-in-france-roof-tiles-rain-down-from-the-sky/feed/ 0 22336
Buying new build property in France via a developer or builder https://thegoodlifefrance.com/buying-new-build-property-in-france-via-a-developer-or-builder/ https://thegoodlifefrance.com/buying-new-build-property-in-france-via-a-developer-or-builder/#respond Fri, 26 Oct 2012 14:42:18 +0000 https://thegoodlifefrance.com/?p=12057 New build properties are particularly popular with French buyers – probably because it can be cheaper than buying an old property and updating it to modern standards, particularly in the case of heating, plumbing, insulating etc. This area is strictly regulated in France and developers must have a bank guarantee in place for each new […]

The post Buying new build property in France via a developer or builder appeared first on The Good Life France.

]]>

New build properties are particularly popular with French buyers – probably because it can be cheaper than buying an old property and updating it to modern standards, particularly in the case of heating, plumbing, insulating etc. This area is strictly regulated in France and developers must have a bank guarantee in place for each new development.

This guarantee is provided in the Deed of Sale to ensure that the new development will be completed to the advertised standards even if the developer or construction company runs into financial difficulties.

If this is the route that you wish to go you will first need to identify a developer/builder. You’ll need to find land for building on and make sure that it is appropriate for building a house (check with the notaire to be absolutely certain) and you will most likely need to employ an architect to design the house and draw up plans for submission to acquire the correct building permits. Theoretically, you can design, build and acquire permits without help but in our experience this rarely if ever happens as the rules and regulations are onerous and complex.

A builder may have a “model” property – a pre-determined type of property, assuming that the land you buy comes with a “terrain a battir” guarantee (land for building), and you are using a reputable builder, this is often the quickest way to get permission to build. This is because the models are designed with local planning requirements in mind and they are often at competitive prices. Developer’s officers in the high street can often look like estate agents – they are a common site in France.

If you go with a developer/builder who is helping to locate land – make sure that you visit the site and are clear on the plot you require. Also check exactly where the property will be located on the land to ensure you are satisfied – there can be caveats with the permission to build on “terrain a battir” that precisely state on which part of the land a building can be erected and the size of the building footprint may be specified.

You’ll need to pay a deposit (typically 2-5%) which will be held in escrow by the notaire or developer (make sure he has a license to hold the money) – you have one week to change your mind. When you pay the deposit you’ll sign a “Contrat de reservation” – this will reserve the property and fix the price.

The building contract is defined in French law and includes:

A definition of what is to be built

The schedule of stage payments

Schedule of construction

Penalty clauses for late completion by the builder/late payment by the buyer

There will be other statements included – each contract is individual rather than standard. Generally speaking the time between the signing of the contract and the completion date is 4-6 months.

When the property is ready for occupation you will need to visit accompanied by the developer (or a representative). You should carefully examine the property and agree snagging issues. You will then have a period of 30 days in which to identify any further problem/snagging requirements which you should notify to the developer by recorded delivery post.

The post Buying new build property in France via a developer or builder appeared first on The Good Life France.

]]>
https://thegoodlifefrance.com/buying-new-build-property-in-france-via-a-developer-or-builder/feed/ 0 12057